From consultation to full-scale implementation, our team is committed to delivering efficient, cost-effective, and sustainable energy solutions—on time and within budget.
Featured Project
Indonesia
Two 7044GSI/JGK4 2-stage compressor packages with 24-hour O&M, has now surpassed 44,000 operational hours, consistently delivering 97% runtime availability – meeting our guaranteed performance.
To ensure continued reliability for years to come, our team is currently performing top-end overhauls.
Featured Project
Nigeria
Start-up of a customer owned 30MMSCFD mechanical refrigeration plant.
Featured Project
Santa Fe, Texas
New 5-stage, 400 BHP CNG compressor Package featuring two Compressors (one boosting from 16 to 87 psig, and the other, a 4-stage unit, taking it to 3600 psig), powered by WEG electric motors. A Siemens PLC provides advanced automation control.
Featured Project
Veracruz, Mexico
14 Refurbished Compressor Packages of a Waukesha 7044GSI and Ariel JGK4. Total timeframe 120 Days.
Featured Project
Colombia
30” OD x 90” S/S 1428 psi MAWP Filter Coalescer Skids. These coalescing filters can treat up to 37 MMscfd and will be used to eliminate lube oil droplets entrained in the gas stream.
Featured Project
Northern Colombia
3 Stage Ariel JGJ4 compressor driven by a Waukesha F3521GSI engine (rated for 738 BHP @ 1200 rpm).
Featured Project
Southern Tunisia
Installation of a Vapor Recovery Unit for our E&P client in order to eliminate natural gas flaring into the atmosphere.
The VRU compressor consists of an Ariel JGJ2 gas compressor driven by a Caterpillar G3406TA gas engine (rated for 276 BHP @ 1800 rpm). Natgas also installed on this unit an Engine Integrated Control System (EICS) to optimize engine performance and maintain carbon emission compliance.
Featured Project
Brazil
Spotlight on a swift 15,000 BHP compression project in Brazil completed in phases of 8 to 16 weeks. Our team pulled off a small miracle to supply 5 units as pros: 03 Waukesha 12V 275 with Ariel JGC4 compressors and 02 Waukesha 7044 series 5 with Ariel JGD4 compressors.
The project called for a quick redesign of existing units to meet delivery targets in just 4-6 weeks!
Africa Projects
Nigeria
Gas Compression
2018-2019
Supply of (1) 100 MMscfd Cryogenic Plant and 35,000 BHP of Gas Compression and BOP Equipment
Nigeria
Process and Treating
2024-2026
Overhaul of Major Equipment of an existing 100MMscfd Cryogenic Plant with O&M for 3-years
Americas Projects
Asia Projects
Indonesia
Gas Compression and Process & Treating
2014-2015
40 MMscfd LPG Cryogenic Plant with 6000 HP of Gas Compression
Indonesia
Gas Compression and Process & Treating
2015-2017
3-year O&M Contract of 40 MMscfd Cryogenic Plant and Gas Compression
Indonesia
Power Generation
2016-2017
Refurbished 1680HP Compressor/400HP Screw Compressor/Fuel Gas Skid
Indonesia
Gas Compression
2019-2020
Lease of 3360HP of Gas Compression with 3-year Operation and Maintenance
Middle East & North Africa Projects
Tunisia
Process & Treating
2018-2019
Supply and Commission of 25 MMscfd Mechanical Refrigeration Plant
Pakistan
Gas Compression
2019
Supply of (1) 1380HP Gas Compressor Package
Tunisia
Process & Treating
2022-2024
2-year O&M Contract for 25 MMscfd MRU Plant
Tunisia
Gas Compression
2023
Supply of (1) 325HP Gas Compressor Package